Boiler Upgradation and modification

Boiler upgradation & modification
Boiler upgradation and modification involve improving existing boiler systems to enhance their performance, efficiency, safety, or compliance with new regulations. These processes can encompass various changes, upgrades, or alterations to different components or systems within the boiler. We provide the following modificatiion services.
-
Modification in Steam Drum, Water drum & Bank Tube assembly
-
Modification in Super Heater & Economiser assembly.
-
Modification in Membrane panels & Headers assembly
-
Modification in Heating Surface area
-
Modification in Grate area
-
Modification in ducting
-
Modification in Bagasse Handling system
-
Upgradation in Feed pump assembly
-
Upgradation in SA FD & ID fans assembly
-
Space tube boiler converted into Membrane panels
Upgradation and Modification work

Our experience in upgradation and modification
-
Shreenath Mhaskoba Sakhar Karkhana Ltd.
Design and supply for Capacity enhancement of BPEPL Make Boiler from Capacity – 32 TPH to 50 TPH.
Design and supply for Capacity enhancement of Walchandnagr Industries Ltd. Make boiler from 50 TPH to 70 TPH.
-
Satyam Petrochemical Masur.
Design and supply for Capacity enhancement of Thermax make boiler from 11 TPH to 13 TPH Working pressure- 45 Kg/Cm2, Working temperature 440°C.
-
Shri Kedareshwar Sahakari Sakhar Karkhana Ltd.
Design & Supply for Capacity enhancement of 32 TPH ISGEC John Thompson make Boiler Working pressure- 32 Kg/Cm2, Working temperature 380°C.
-
Kisanveer Satara SSK Ltd.
Design & Supply for Thermax make boiler capacity enhancement from 10 TPH to 20 TPH.
-
M/s. Deccan Sugar Pvt Ltd.
Design and supply for Capacity enhancement of NHEC-making boiler from 32 TPH to 40 TPH with panel Type construction & and Water Cooled pin hole grate assembly.
-
Siddhi Sugar & Allied Industries Ltd.
Design & Supply for Capacity enhancement Walchandnagr Industries Ltd. Make boiler from 32 TPH to 38 TPH with Membrane panel type construction